Lake Tahoe Basin and El Dorado County Roadwork Schedule
Sunday through Saturday, May 21-27, 2017
NOTE: Most traffic-interfering work will be restricted from 6 a.m. Friday, May 26 through 10 p.m. Monday, May 29 for the Memorial Day holiday weekend.
EMERGENCY PROJECTS
U.S. Highway 50 (El Dorado County): The highway is reduced to one lane in each direction at Bridal Veil Falls for slope repair work.
U.S. Highway 50 (El Dorado County) at Silver Fork Road in Kyburz: Motorists can expect intermittent one-way traffic control from 7 a.m. to 5 p.m. Monday through Thursday and 7 a.m. to noon Friday for drainage work.
LONG-TERM PROJECTS
U.S. Highway 50 (El Dorado County): Work continues on a $57 million project from the “Y” intersection with State Route 89 to the Trout Creek Bridge in South Lake Tahoe. This project is building new drainage systems to collect and treat stormwater runoff, rebuilding curb, gutter and sidewalks, widening the highway to allow for bike lanes and resurfacing the roadway. Completion is expected in fall 2019.
U.S. Highway 50 (El Dorado County) from Dunlap Drive to Tahoe Keys Boulevard: Eastbound and westbound motorists can expect the #2 lane closed around the clock from 6 a.m. Monday to 6 a.m. Friday for drainage and electrical work.
SHORT-TERM PROJECTS
U.S. Highway 50 (El Dorado County) from Rufus Allen Boulevard to Ski Run Boulevard in South Lake Tahoe: Westbound motorists can expect the #2 lane closed from 7 a.m. to 5 p.m. Monday through Wednesday for curb, gutter and sidewalk work.